Five-hundred-meter Aperture Spherical Radio Telescope (FAST) Project of National Astronomical Observatories, China, 2016

Hong Kong-Zhuhai-Macao 
Bridge, China, 2016

Yang Si Gang Bridge, China, 2016

The 3rd Ping Nan Bridge, China, 2019

Yavuz Sultan Selim Bridge, Turkey, 2016

Feng Huang Ling Bridge, China, 2022

BRIDGE 1 TO 5 IN HULHUMALE

Country / Region:Maldives

Location:ULHUMALE

Project Profile:

The bridges 1 to 5 in Hulhumale, Republic of Maldives,within the scope of the project for the development of Hulhumale Island. Bridge 1, 2, 4 span length is 52.0 m, Bridge 3 span length is  53. 1m, Bridge span length is 27.0 m. Theconstruction technique is mainly based on the supporting of the structures on abutments with piles. Superstructure of all bridges are to be made with post-tensioned in-situ reinforced concrete.

Bintulu-Jepak Bridge

Country / Region:Malaysia

Location:Sarawak

Project Profile:

The total length of the Bintulu-Jepak Bridge project is 3586.234 meters, and the bridge span arrangement is (108.4+267.6+108.4) m.

Scope of OVM:  Supply and installation of 96 stay cables, supply of post-tensioning systems, high strength PT bars, and expansion joints.

Hwapo Bridge

Country / Region:Korea

Location:Korea

Project Profile:

The main span is 260 meters with two towers and two cable-stayed planes.

Scope of OVM:  Provided 104 parallel steel wire stay cables for the full bridge, with a total weight of 490 tons of steel wire.

DALA Bridge

Country / Region:Myanmar

Location:Myanmar

Project Profile:

The span of the DALA Bridge is (160+370+160) m, the pylon height is 139m.  Arranged with 20 pairs of stay cables, and the specifications of the cable anchors are 6-31/37/43/55/61. The total weight of the steel strand for Project is 1061.6 tons.

Scope of OVM: OVM250 stay cables and installation service.

J.P.MAGUFULI Bridge

Country / Region:Tanzania

Location:Tanzania

Project Profile:

located on the south bank of Lake Victoria, with a total length of 3.2 kilometers. When completed, the bridge will become the longest extradosed cable-stayed bridge in Africa.

Sope of OVM: Bearings, expansion joints, cable-stayed system, and installation services.

Yavuz Sultan Selim Bridge

Country / Region:Turkey

Location:Turkey

Project Profile:

The bridge is  establishing cross-sea bridge on Bosporus Strait. Main span1500m , width 59m, the widest bridge in the world.

Sope of OVM: Hanger Cable system.

Maputo-Katembe Bridge

Country / Region:Mozambique

Location:Mozambique

Project Profile:

The bridge is designed as a single-span gravity anchorage suspension bridge with a main span of 680 meters and an elevation of 141.2 meters for the south and north towers and is the largest suspension bridge in Africa.

Scope of OVM: PT materials & equipment, cable splay saddle&cable clamp and cable tightening machine.

Padma Bridge

Country / Region: Bangladesh

Location:Bangladesh

Project Profile:

Padma bridge is located about 40 kms southwest of Dhaka. It crosses the padma river. It is a dual highway and rail bridge with a two-way four-lane highway at the upper level and a single-lane railway at the lower level. Its superstructure consists of steel truss-beams with 41 holes and a span of 150 meters.The main bridge is 6,150 meters long and  21.65 meters wide.

Scope of OVM: PT system.

Mulanur Windfarm

Country / Region:India

Location:India

Project Profile:

It consists 100 nos of 3MW WT forming total capacity 300MW for tenure of 25 years. The concrete tower heights 120m, each being reinforced by 6nos external tendons & each tendon contains 17-15.7mm PC strands. 

Scope of OVM: EPC (External Prestressing Cable) system for WT  Industryand technical supports & supervision services.

Karot Hydropower

Country / Region:Pakistan

Location:Pakistan

Project Profile:

The “Karot Hydropower” Project is a concrete-core rockfill gravity large dam being built in Pakistan, with a planned installed capacity of 720 MW.

Scope of OVM: LDM15B Anchor Cable system/ OVM.M15A anchorage system/Spherical Bearing/GYZ Bearing/MF240/ C60 Expansion Joint /Tensioning Equipment  Pump & Jack).

Belgrade Bypass Sector

Country / Region:Serbia

Location:Serbia

Project Profile:

Belgrade Bypass is  located in the southeast of Belgrade, Serbia. Section 4 was officially opened on April 29, 2021. The length of section 4 is 7.72 KM, and it is a two-lane left side expressway. Section S5 was opened in June 2022.

Scope of OVM: PT system / Equipment.

Autopista al Mar 2 Highway

Country / Region: Columbia

Location:Columbia

Project Profile:

The autopista al mar 2 project consists of six functional units, which cover a length of 254 kilometers, between the municipalities of canasgordas and necocli, in antioquia.

The works include the construction of 17.7 kilometres of single carriageway, 63 Bridges and 14 tunnels.

Scope of OVM: PT anchorage and installation services.

Tseung Kwan O – Lam Tin Tunnel

Country / Region:China

Location:Hongkong 

Project Profile:

The works include construction of a marine viaduct forming the TKO Interchange at Junk Bay. The Project started on 22/Jan/2018, and opened on 11/Dec/2022 at 8am.

Scope of OVM: OVM.M15A anchorage system/Tensioning equipment ( Pump & Jack)Segmental bridge assembly equipment.

Section C714 of Tanzi Exchange Road Project

Country / Region:China

Location:Taiwan 

Project Profile:

The span from the tower to the opposite abutment is 117m.The Buguan Bridge across the Hanxi River is designed as a single tower asymmetric slanted bridge with the image of the string moon, with a total length of 138 meters.

Scope of OVM: PT syste.m.

4th bridge of Abidjan

Country / Region:Côte d'Ivoire

Location:Côte d'Ivoire 

Project Profile:

The bridge which extends 1.4 km above Banco Bay is part of a comprehensive project to strengthen transport infrastructure and to decongest the city of Abidjan.

Scope of OVM: PT system which is being used for the reinforcement of the bridge’s concrete structure, with total amount of 2,000 Tonnes for Internal Prestressing Tendons and 400 Tonnes for External Prestressing Tendons. 

Central Business District

Country / Region:Egypt

Location:Egypt

Project Profile:

The new Central Business District (CBD) for the Egyptian capital undertaken by China State Construction Engineering Corporation (CSCEC)  including 20 residential, administrative, commercial and services towers,OVM supply the PT system and supervision.

Scope of OVM: PT syste

E60 F1 Lot 

Country / Region:Georgia

Location:Georgia

Project Profile:

E60 Interstate Highway starts from Brest, France, along the Atlantic coast of France to Kyrgyzstan near the border with China. It is now the first national project of Georgia. 

Scope of OVM: supplied anchors, plate supports and expansion joints. 

Red Sea Village Development

Country / Region:KSA

Location:KSA

Project Profile:

OVM Complete 1130 Tons post-tensioning work for 5 box girders bridges for client of Al Thuraya.

Sope of OVM: PT system supply and construction supervision.

Tuas Water Reclamation Plant (TWRP) Dtss Phase 2

Country / Region:Singapore

Location:Singapore

Project Profile:

Located in the south west corner of Singapore, the Tuas Water Reclamation Plant (TWRP) project involves the construction of a new water treatment facility as part of Singapore's Deep Tunnel Sewage System Phase 2. OVM has achieved a double breakthrough in new products and new application fields in this project, and has also laid a solid foundation for participation in Singapore's MRT projects.

Sope of OVM: PL2 protection level anchorage and ring anchorage.

Metro Line 3

Country / Region:Panama

Location:Panama

Project Profile:

Panama metro line 3 is a 34km-long,which  will establish a connection between the province of Panama Oeste and the province of Panama.

Sope of OVM: PT materials and equipment, and provide on-site guidance services.

North-south Commuter Railway

Country / Region:Philippines

Location:Philippines

Project Profile:

The Philippine North-south Commuter Railway (NSCR) is a 163 km rail network serving commuters between Manila, central Luzon, and Calabalsung.

Sope of OVM: PT materials, equipment, and on-site guidance services in package CP N-01.

Sino-Thai Railway

Country / Region:Thailand

Location:Thailand

Project Profile:

The 253-kilometer first phase of the China-Thailand Railway is the first large-scale special project OVM has participated in in the Thai market.

Sope of OVM:OVM supplied PT system for Section 2-1 and 4-7.

East Coast Rail Link Project

Country / Region:Malaysia

Location:Malaysia

Project Profile:

The project total length of about 665 kilometers, the project will boost the economic development of Malaysia's east coast region and greatly improve connectivity along the route.

Sope of OVM:Anchorage,intelligent tensioning equipment,intelligent groutingequipment,elastomeric bearing,expansion joint.

Rod El Farag Cable Stayed Bridge

Country / Region:Egypt

Location:Egypt

Project Profile:

Rod El Farag bridge is the world’s widest stay cable bridge with a total width of 67.36m, and was opened to traffic on May 15th, 2019.

Sope of OVM: OVM250 stay cable system with blast and fire protection, and cable force monitoring system,  supervised cable installation and stressing with OVM equipment and technology.

Aby River Bridge

Country / Region:Ethiopia

Location:Ethiopia

Project Profile:

The bridge is the longest cable-stayed bridge in Ethiopia. The Abay Bridge has a 21.5m width and the capacity to accommodate a three-lane carriage way, a bicycle path and a walkway.

Sope of OVM: PT system, extradosed stay cable system and construction.

Zuari Bridge

Country / Region:India

Location:India

Project Profile:

The whole systemic materials include appr.1300 tons of PE strand, 224 sets of anchorages, 160 sets of high performance dampers, 25,000+m HDPE Pipes, On-line cable force monitoring system, and accessories,etc.

Sope of OVM: OVM250 Stay Cable Systems.

New Chroy Changva Bridge

Country / Region:Cambodia

Location:Cambodia

Project Profile:

Span arrangement(72+120+120+120+72)m.

This is the first extra-dosed stay cable project OVM has participated in Cambodia.

Sope of OVM: PT system, bridge bearing&expansion joints, pre-stressing equipment and special equipment for cable installation.

J.P.MAGUFULI Bridge

Country / Region:Tanzania

Location:Tanzania

Project Profile:

located on the south bank of Lake Victoria, with a total length of 3.2 kilometers. When completed, the bridge will become the longest extradosed cable-stayed bridge in Africa.

Sope of OVM: Bearings, expansion joints, cable-stayed system, and installation services.

Five-hundred-meter Aperture Spherical Radio Telescope (FAST) Project of National Astronomical Observatories

Country / Region:China

Location:Guizhou

Project Profile:

Cable Pcs.: 6670 pcs 

Weight: 1200MT

Upper stress: 0.4fpdk     

Stress range: 500Mpa              

Length tolerance: +/-2mm.

Sope of OVM: OVM contracted to supply and install cable network.

LNG Tank Project 

Country / Region:China

Location:Tianjin

Project Profile:

2 X 200,000m³ LNG steel  storage tank ,8 X 220,000m³  LNG film tank.

Sope of OVM: Supplied cryogenic prestressing system.

Photovoltaic Project

Country / Region:China

Location:Hainan

Project Profile:

China's first photovoltaic project in Hainan province .

Sope of OVM: Supplied  prestressing and cable technology and special construction guidance services for flexible photovoltaic supports.

Tong Ling Highway-railway Bridge over Yangtze River

Country / Region:China

Location:Tongling

Project Profile:

Rod El Farag bridge is the world’s widest stay cable bridge with a total width of 67.36m, and was opened to traffic on May 15th, 2019.

Sope of OVM: OVM250 stay cable system with blast and fire protection, and cable force monitoring system,  supervised cable installation and stressing with OVM equipment and technology.

Yang Si Gang Bridge

Country / Region: China

Location:Wuhan

Project Profile:

Main span 1700m, the 3rd largest suspension bridge in the world.

Sope of OVM: Supply and installation of  main cable, ground anchor etc.

Bei Pan Jiang Bridge

Country / Region: China

Location:Yunnan/Guizhou

Project Profile:

Length 1,341.4m, main span 720m, Height 565m, the highest bridge in the world.

Sope of OVM: Supply and installation of  OVM stay cable system.

Hong Kong-Zhuhai-Macao Bridge

Country / Region:China

Location:Macao

Project Profile: 

 Span 630 m, height of pylon 220m, stay cable 5,632 tons , 6-lane expressway on the upper deck, 4-lane railway below.

Sope of OVM: Supplied multi-strand stay cable  system & undertook the installation.  

The 3rd Ping Nan Bridge

Country / Region:China

Location:Guigang

Project Profile:

 The “Third Pingnan Bridge” located in Guangxi, China was completely constructed and opened to traffic back in 2020 with total length of 1,035 meters and main span of 575 meters making it the largest Arch Bridge in the world.

Sope of OVM: Supplied and  installed extruded  hanger  cable as well as smart monitoring  system.

Feng Huang Ling Bridge

Country / Region:China

Location:Liuzhou

Project Profile:

The bridge is currently the largest steel-concrete composite girder bridge in China, the world's largest span, and the largest cross-river Wind and Rain Bridge, whose main span is 700 meters with a 46.6 meters wide deck, and the length of its main line reaches 1.6 kilometers.

Sope of OVM: Steel Box Girder Incremental launching  and Construction of External Prestressing.

Pei Sen River Bridge

Country / Region:China

Location:Hezhou

Project Profile:

With a main span of 280 meters, the world’s largest span highway prestressed concrete partial cable-stayed bridge.

Sope of OVM: Supply and installation of  OVM stay cable system.

Longmen Suspension Bridge

Country / Region:China

Location:Qinzhou

Project Profile:

Length 1198m, main span 1098m.

Sope of OVM: Supply and installation of OVM anchor block system and OVM cable crane.

Xiangshan Bridge

Country / Region:China

Location:Zhongshan

Project Profile:

With a main span of 880 meters, it is the double-decker highway truss girder cable-stayed bridge.

Sope of OVM: Supply and installation of  OVM stay cable system.

Ma'anshan Yangtze River Highway-Railway Bridge

Country / Region:China

Location:Ma'anshan

Project Profile:

It is the first three-tower cable-stayed bridge in the world with double main spans exceeding 1,000 meters. It is also the longest combined steel truss bridge in the world with total lenth of 3248m.

Sope of OVM: Supply and installation of  OVM stay cable system.