-
- OVM Post-tensioning System
- Nuclear Power and LNG Engineering Applications
- Assembled Connection Technology for Prefabricated Piers
- Multi-strand Stay Cable System Solutions for Cable-stayed Bridge
- Cable System Solutions for Extradosed Bridge
- Parallel Wire Stay Cable System(PWS) for Cable Stayed Bridge
- Sulotions of Carbon Fiber Reinforced Composite Materials for Post-tensioning System
- Cable System Solutions for Arch Bridge
- External Post-tensioning System Solutions
- Bridge Anti-seismic Solutions
- Expansion Joints Solution System
- Building Anti-seismic Solutions
- Structural Inspection and Reinforcement System Solutions
- Lifting, Pushing, or Rotating of Overweight Structure
- Underground Space - shield Tunneling, Foundation Pit Support Equipment and Systems Solutions
- Structural Inspection and Reinforcement System Solutions
Structural Inspection and Reinforcement System Solutions
Liuzhou OVM Engineering Co., Ltd., established in 1985, is an independent legal entity construction enterprise. The company's business spans multiple areas, including the installation and reinforcement of bridges, tunnels, water conservancy and hydropower projects, slope and foundation pits, buildings, nuclear power, natural gas, and special structures.
· General contractor for building construction projects, class II
· General contractor for municipal public works, class II
· Specialized contractor for foundation engineering, class II
· Specialized contractor for special projects (structural reinforcement), ungraded
· Specialized contractor for special projects (building correction and translation), ungraded
· Specialized contractor for bridge engineering, class II
· General contractor for electrical engineering projects, class II
Second level qualification for construction enterprises
Application Cases
Scope of Construction
Chongqing Mingyue Gorge Yangtze River Bridge (2021)
Main span: 425 meters, China's first double-deck four-line railway asymmetrical vase-shaped bridge tower steel truss cable-stayed bridge
OVM supplied the steel strand cable system with a fatigue stress amplitude of 280 MPa and installation services.
· Specialized construction in prestressing;
· Construction of bridge maintenance and reinforcement projects;
· Anchor cable and anchor rod slope management and pit support engineering;
· Construction involving the lifting of super-heavy and oversized components, jacking, and turning.
Liuzhou OVM Machinery Co., Ltd.
Tel: +86-772-3116402
Website: www.ovm.cn
E-mail: sales@ovm.cn
Address: No.1 Yanghui Road, Liuzhou, Guangxi, 545006, P.R.China.