-
- OVM Post-tensioning System
- Nuclear Power and LNG Engineering Applications
- Assembled Connection Technology for Prefabricated Piers
- Multi-strand Stay Cable System Solutions for Cable-stayed Bridge
- Cable System Solutions for Extradosed Bridge
- Parallel Wire Stay Cable System(PWS) for Cable Stayed Bridge
- Sulotions of Carbon Fiber Reinforced Composite Materials for Post-tensioning System
- Cable System Solutions for Arch Bridge
- External Post-tensioning System Solutions
- Bridge Anti-seismic Solutions
- Expansion Joints Solution System
- Building Anti-seismic Solutions
- Structural Inspection and Reinforcement System Solutions
- Lifting, Pushing, or Rotating of Overweight Structure
- Underground Space - shield Tunneling, Foundation Pit Support Equipment and Systems Solutions
- Structural Inspection and Reinforcement System Solutions
News
-
OVM Showcases Leading Prestressing & Seismic Solutions at Concrete Show SEA 2025
2025-09-15
-
OVM Enables World-Record 1,900-Ton Arch Lift for Qinjiang Bridge
2025-09-09
-
OVM Showcases Cutting-Edge FRP Innovations at 2025 Civil Engineering Composites Summit
2025-09-08
-
OVM Ships First Automated Ground Anchors to Major Water Project
2025-09-05
-
OVM Completes Stay Cable Installation for Jinqi Super Bridge
2025-09-05
-
Exciting Milestone for the 5th Thai-Lao Friendship Bridge!
2025-07-21
-
Exciting Milestone for the 5th Thai-Lao Friendship Bridge!
2025-07-10
-
Liuzhou OVM Machinery Co., Ltd. and Institut Teknologi Sepuluh Nopember (ITS) Sign MoU for Development of Lead Rubber Bearing Testing Machine
2025-07-09
-
A Proud Milestone for OVM Indonesia: Benitto Binno Christiawan Shines at the Indonesia Building Technology Expo 2025
2025-07-09
Liuzhou OVM Machinery Co., Ltd.
Tel: +86-772-3116402
Website: www.ovm.cn
E-mail: sales@ovm.cn
Address: No.1 Yanghui Road, Liuzhou, Guangxi, 545006, P.R.China.