OVM Post-tensioning system

OVM Post-tensioning system is widely used in bridges, buildings, geotechnicalengineering to nuclear power plants, water conservancy and hydropower facilities, andrenewable energy projects.The product has gained unanimous recognition fromsociety due to its reliable performance. OVM awarded the title of Manufacturing SingleChampion Demonstration Enterprise.

Features

· Comply with the specifications and recommendations: ASTM,AASHTO,FIP,ETAG013,EAD 160004-00-0301,BS,GB/T 14370,etc.

· Anchorage for 1-55 strands

· Adaptable for strand with various strength up to 2400Mpa

OVM participates in the compilation of some standards in this system

Number Standard type Standard name Standard number Participate in editing
1 National standard Anchors, clamps, and connectors for prestressed reinforcement GB/T 14370-2015 Participate in editing
2 Row label Anchors, clamps, and connectors for prestressed steel strands of highway bridges JT/T 329-2010 Participate in editing
3 Row label Technical specifications for the application of anchors, fixtures, and connectors for prestressed reinforcement JGJ85-2010 Participate in editing

 

Qualification certificate

Guangxi Famous Brand Product Certificate:OVM Post-tensioning System Products

Award Certificate:The Wedge Type Multi-anchor Stayed Cable Systemand the Installation Method

Science and Technology Achievement Appraisal Certificate:OVM Post-tensioning system

Anchor System Certification

Application cases

Tuas Water Reclamation Plant (TWRP) Dtss Phase 2, Singapore OVM supplied Pl2 protection level anchorage system.

Pearl River Water Resources Project, 2023
OVM supplied Ring Anchoring system products and Epoxy-coated unbonded strands.

Shanghai Maglev Line, China, 2002 OVM supplied PT system.

Xinjiang Hami Wind Power Station Project, 2017
OVM supplied post-tensioning system, health monintor system and installation services.

Mohmand Hydropower Plant in Pakistan
OVM supplied strand tendon (active) anchor system and construction equipment

Central Business District Of the New Administrative Capital, Egypt OVM supplied PT system.

East Coast Rail Link, Malaysia
OVM supplied PT system, elastomeric bearings and expansion joints.