- OVM Post-tensioning System
- Nuclear Power and LNG Engineering Applications
- Assembled Connection Technology for Prefabricated Piers
- Multi-strand Stay Cable System Solutions for Cable-stayed Bridge
- Cable System Solutions for Extradosed Bridge
- Parallel Wire Stay Cable System(PWS) for Cable Stayed Bridge
- Sulotions of Carbon Fiber Reinforced Composite Materials for Post-tensioning System
- Cable System Solutions for Arch Bridge
- External Post-tensioning System Solutions
- Bridge Anti-seismic Solutions
- Expansion Joints Solution System
- Building Anti-seismic Solutions
- Structural Inspection and Reinforcement System Solutions
- Lifting, Pushing, or Rotating of Overweight Structure
- Underground Space - shield Tunneling, Foundation Pit Support Equipment and Systems Solutions
- Structural Inspection and Reinforcement System Solutions
Mohmand Dam, Pakistan
Country / Region
Pakistan
Project Profile
The hydroelectric dam, located in Khyber Pakhtunkhwa province, will be used for flood storage, irrigation and hydroelectric power generation, the Pakistan Hydropower Development Agency said. The project is expected to cost $2.2 billion with an annual economic benefit of $369 million and will be completed in July 2024. With a height of 700 feet, the dam will hold water for a power plant with a capacity of 800MW and an estimated annual output of 2,862 GWH.
Application of OVM Product / Service
Water Reserve and Hydropower;Hydropower Station Pier;Post-tensioned Prestressed Construction Equipment;Suoervision or Technical Service,OVM;OVM Geotechnical Anchor Cable,Anchor Bar
Learn more about our product systems
Liuzhou OVM Machinery Co., Ltd.
Tel: +86-772-3116402
Website: www.ovm.cn
E-mail: sales@ovm.cn
Address: No.1 Yanghui Road, Liuzhou, Guangxi, 545006, P.R.China.