• ꀅ Service System
    • OVM Post-tensioning System
    • Nuclear Power and LNG Engineering Applications
    • Assembled Connection Technology for Prefabricated Piers
    • Multi-strand Stay Cable System Solutions for Cable-stayed Bridge
    • Cable System Solutions for Extradosed Bridge
    • Parallel Wire Stay Cable System(PWS) for Cable Stayed Bridge
    • Sulotions of Carbon Fiber Reinforced Composite Materials for Post-tensioning System
    • Cable System Solutions for Arch Bridge
    • External Post-tensioning System Solutions
    • Bridge Anti-seismic Solutions
    • Expansion Joints Solution System
    • Building Anti-seismic Solutions
    • Structural Inspection and Reinforcement System Solutions
    • Lifting, Pushing, or Rotating of Overweight Structure
    • Underground Space - shield Tunneling, Foundation Pit Support Equipment and Systems Solutions
    • Structural Inspection and Reinforcement System Solutions
  • Project
  • ꀅ About us
    • Company Profile
    • Innovative Technology
    • Marketing Network
    • Employee Story
    • Talent Recruitment
    • Contact Us
  • ꀅ Download
    • Prestress Technology
    • Brochures and Catalogues
  • News
  • Global Websites
    • Indonesia
    • Malaysia
    • Pусский
끠
ꀅ English
  • English
  • 简体中文
0
  • Construction Service
    • Bridge
    • Building
    • Specialized Professional Engineering and Equipment
    • Reinforcement
    • Energy
  • Maintenance
    • Reinforcement
  • Monitoring
    • Automatic Collection and Monitoring Subsystem
    • Management Manual and Electronic Patrol Inspection Management subsystem
    • Comprehensive safety evaluation subsystem
    • Lasting cable force monitoring system
  • Leading-edge Technology
    • Carbon Fiber Reinforced Composites
    • Shock Absorption and Seismic Resistance
    • Offshore Wind Energy
    • Photovoltaic
    • LNG Tank Liquefied Natural Gas Tank
  • Equipment
  • Post-tensioning
    • Post-tensioning System
    • OVM Multistrand Post-tensioning
    • OVM Slab Post-tensioning
    • OVM Special Post-tensioning
    • OVM External Prestressing System
    • PL2/PL3
    • Post-tensioning Equipment and Service
    • Mono-jack YDC
    • Hydraulic Jack YCW
    • Built-in Jack YDCN
    • Hollow Piston Jack YC (L)
    • Hydraulic Pump
    • Bulb Machine YH3B
    • Heading Machine
    • Intelligent Grouting System LGSTC-700B
    • Integrated Mix and Grouting Machine GS300
    • High Speed Mixer JC500
    • Screw Pump LGB3
    • Mortar Pump UB3
    • Vacuum Pump ZKB
    • Smart Prestressing Tensioning System (OVM-SPT)
    • Project References
  • Cable
    • Cable-stayed bridge
    • OVM250 Multi-Strand Stay Cable System
    • OVM280 Multi-Strand Stay Cable System
    • OVMAT Stay Cable System for Extradosed Bridges
    • Parallel Wire Stay Cable System
    • Suspension Bridge & Arch Bridge
    • Main Cable of Suspension Bridge
    • OVM Tie Calbe System
    • GJ Prefabricated Strand Cable System
    • Other Bridges
    • External Cable System
    • Flexible Cable System
  • Bearing and EJ.
    • Normal Bearings
    • Elastomeric Bearing
    • Pot Bearing
    • Spherical Bearing
    • Anti-seismic Device
    • Lead Rubber Bearing
    • High-Damping Rubber Bearing
    • Pendulum Bearing
    • Expansion Joints
    • Strip Seal Type
    • Rubber Type
    • Modular Type
    • Finger Type
    • Dampers
    • Viscous Fluid Damper
    • Magnetorheological Damper
    • Eddy Current Tuned Mass Damper

OVM officially kicks off the production of the main cable for the Cangrong Xunjiang River Bridge in Guangxi.

OVM officially kicks off the production of the main cable for the Cangrong Xunjiang River Bridge in Guangxi.

 

The Cangrong Xunjiang River Bridge, with its unique central single-tower design and an ultra-large main span, features "one world's record and four domestic firsts," making it the world's largest single-column triple-tower spatial cable suspension bridge, the first triple-tower spatial cable suspension bridge in China with a main span exceeding 500 meters, the first suspension bridge in China utilizing dual deep-groove saddles, the first suspension bridge in China employing a combined pile-wall anchorage foundation structure, and the first triple-tower spatial cable suspension bridge constructed using a cables-before-girder construction method. Supporting this bridge are 1500 meters of high-quality main cables meticulously produced by OVM .

The two main cables of the Cangrong Xunjiang River Bridge are designed to serve alongside the bridge for a century without the need for replacement, each composed of 37 strands, with each strand consisting of 127 galvanized high-strength steel wires of 6mm diameter and 1960MPa.

OVM possesses advanced production lines and robust manufacturing capacity. In recent years, OVM has upgraded its production lines to meet the ever-changing market demands continuously. OVM will continue to uphold the spirit of "striving forward and climbing to new heights," contributing more to the cause of bridge construction!

 

938f5ac56adcb5f9bae26c5eeadd0394

 

3f21ce53493226e087bfcd3d5902f9c2

ꄴPrevious: null
ꄲNext: null
All rights reserved © Liuzhou OVM Machinery Co., Ltd.

Liuzhou OVM Machinery Co., Ltd.

Tel: +86-772-3116402

Website: www.ovm.cn

E-mail: sales@ovm.cn

Address: No.1 Yanghui Road, Liuzhou, Guangxi, 545006, P.R.China.

ABOUT OVM

  • Corporate Culture
  • Company Profile
  • Developing Route
  • Qualification Certification
  • Innovative Technology
  • Marketing Network
  • Employee Story
  • Talent Recruitment
낂
 本网站由阿里云提供云计算及安全服务
本网站支持 IPv6
 本网站由阿里云提供云计算及安全服务
本网站支持 IPv6
 本网站由阿里云提供云计算及安全服务
本网站支持 IPv6
 本网站由阿里云提供云计算及安全服务
本网站支持 IPv6