-
- OVM Post-tensioning System
- Nuclear Power and LNG Engineering Applications
- Assembled Connection Technology for Prefabricated Piers
- Multi-strand Stay Cable System Solutions for Cable-stayed Bridge
- Cable System Solutions for Extradosed Bridge
- Parallel Wire Stay Cable System(PWS) for Cable Stayed Bridge
- Sulotions of Carbon Fiber Reinforced Composite Materials for Post-tensioning System
- Cable System Solutions for Arch Bridge
- External Post-tensioning System Solutions
- Bridge Anti-seismic Solutions
- Expansion Joints Solution System
- Building Anti-seismic Solutions
- Structural Inspection and Reinforcement System Solutions
- Lifting, Pushing, or Rotating of Overweight Structure
- Underground Space - shield Tunneling, Foundation Pit Support Equipment and Systems Solutions
- Structural Inspection and Reinforcement System Solutions
OVM anisotropic friction pendulum bearing has been successfully installed on the Qingzhang Expressway Yellow Bridge.
Recently, the main pier bearings of the Yellow River Extra-large Bridge on the Qingyun-Zhangqiu Expressway (Qingzhang Expressway) have been successfully installed, marking a significant milestone in the bridge's construction.
As a key project of the Qingzhang Expressway, the Yellow River Extra-large Bridge, with a total length of 4,669.5 meters and a main bridge span of (195+350+195) meters, has set "three world records":
- The largest span continuous beam bridge,
- The first-ever ultra-high performance concrete (UHPC)-steel box hybrid structure,
- The largest-sized UHPC trough beam.
The main pier bearings of the Yellow River on the Qingzhang Expressway were developed and manufactured by OVM, featuring anisotropic friction pendulum bearings with a maximum load capacity of 10,000 tons. They are the largest load-bearing anisotropic friction pendulum bearings in China.
The anisotropic friction pendulum bearing is a new - type energy - dissipation and isolation device. Here are its key features:
- It uses the pendulum principle to lengthen the vibration periods of bridge structures in both longitudinal and transverse directions.
- It can dissipate seismic energy through friction at the sliding interface, thus reducing and isolating seismic impacts.
- This flexibility in parameters allows for better - tailored seismic protection of bridges.
The successful installation of OVM's bearings on the Qingzhang Expressway's Yellow Bridge showcases their innovation in achieving the maximum load-bearing capacity in China. This achievement not only sets a new record but also highlights OVM's technical strength and industry leadership. The anisotropic friction pendulum bearings provide superior seismic protection, marking a significant advancement in bridge construction technology and setting a benchmark for future projects.
Liuzhou OVM Machinery Co., Ltd.
Tel: +86-772-3116402
Website: www.ovm.cn
E-mail: sales@ovm.cn
Address: No.1 Yanghui Road, Liuzhou, Guangxi, 545006, P.R.China.