OVM's 500-ton hydraulic lifting system has successfully completed rigorous overload testing under simulated operational conditions. The equipment demonstrated exceptional performance by:

  • Sustaining a 625-ton static load (125% of rated capacity) at mid-span
  • Executing lifting, lowering, and lateral movements with 550-ton counterweights (110% of rated load)

The engineering team developed a customized asymmetric steel portal frame solution to address the project's spatial constraints and complex piping layout. The comprehensive package included:

 

  • Structural optimization for load distribution and longevity
  • Integrated installation/dismantling protocols
  • Full operational life-cycle support

 

This achievement validates OVM's technical capabilities in delivering heavy-load solutions for space-restricted infrastructure projects while maintaining strict safety margins.