-
- OVM Post-tensioning System
- Nuclear Power and LNG Engineering Applications
- Assembled Connection Technology for Prefabricated Piers
- Multi-strand Stay Cable System Solutions for Cable-stayed Bridge
- Cable System Solutions for Extradosed Bridge
- Parallel Wire Stay Cable System(PWS) for Cable Stayed Bridge
- Sulotions of Carbon Fiber Reinforced Composite Materials for Post-tensioning System
- Cable System Solutions for Arch Bridge
- External Post-tensioning System Solutions
- Bridge Anti-seismic Solutions
- Expansion Joints Solution System
- Building Anti-seismic Solutions
- Structural Inspection and Reinforcement System Solutions
- Lifting, Pushing, or Rotating of Overweight Structure
- Underground Space - shield Tunneling, Foundation Pit Support Equipment and Systems Solutions
- Structural Inspection and Reinforcement System Solutions
Colombo Port City Project
Country / Region
Sri-Laka
Project Profile
The Colombo Port City, located in the heart of the Colombo CBD, is connected to landmarks such as the Hilton. The project was jointly developed by China Jiaotong Construction and the Sri Lanka National Port Authority. The planned construction scale exceeds 5.3 million square meters, including 276 hectares of land reclamation completed in 3 years. It is planned to form a scale from 5 to 8 years, and all construction will be completed in 20 to 25 years. The project started on September 17, 2014.
Application of OVM Product / Service
Port Terminal;Beam Bridge;Post-tensioned Prestressed Construction Equipment;Post-tensioned Prestressed Internal Cable
Learn more about our product systems
Liuzhou OVM Machinery Co., Ltd.
Tel: +86-772-3116402
Website: www.ovm.cn
E-mail: sales@ovm.cn
Address: No.1 Yanghui Road, Liuzhou, Guangxi, 545006, P.R.China.